DEVELOPMENT SERVICING REVIEW PROJECTS

Affordable, mandatory analyses delivered fast — helping developers meet regulatory requirements.

City of Richmond Hill, Water and Wastewater Infrastructure Network Modellling, Richmond Hill, Ontario. AECOM Project. Responsible for keeping track of schedule and budget and invoicing the client for work completed. Managed project on task level. Provided project direction and oversight to EIT staff to complete the tasks. Liaison with client to understand needs and desires. Maintaining a solid working relationship with the client by promptly replied to emails and answering concerns regarding project status and technical approach. Directing technical questions to technical experts and relaying information back to the client. Completed in 2024.

Lambton Area Water Supply System (LAWSS), EPS Model, Point Edward, Ontario. AECOM Project. Created an EPS model for LAWSS from the existing WaterCAD model to be able to run in Extended Period Simulation. Completed in 2019.

Village of Lions Bay, Water Storage Reservoir Replacement, Village of Lions Bay, British Columbia. AECOM Project. Conducted feasibility study for replacement of existing water storage reservoirs using InfoWater hydraulic model. Developed the Village of Lions Bay Water Conservation Plan Update. Completed in 2018.

City of Toronto Pressure Zone 1, 1W, 2 Model Calibration, City of Toronto. AECOM Project. Performed Macro and Micro-level Calibration using InfoWater Software. Reviewed existing City of Toronto Hydraulic Model for deficiencies and updated based on GIS data. Completed in 2017.

Semiahmoo First Nation, Water and Wastewater Servicing Strategy, Semiahmoo First Nation, British Columbia. AECOM Project. Developed a water and wastewater servicing strategy. Reviewed previous 2008 study and collect design criteria information from City of Surrey, City of White Rock, Master Municipal Construction Document Association and Aboriginal Affairs and Norther Development Canada. Built hydraulic water model using InfoWater modelling suite. Performed hydraulic analyses including Fire Flow Analysis and Maximum Velocity Analysis. Built hydraulic sewer model using PCSWMM modelling suite. Provided schedule D cost estimates for 3 servicing options to the client. Completed in 2017.

Region of Peel Hydraulic Model Update and Calibration, Peel, Ontario. AECOM Project. Led the technical work for updating the current Region of Peel Hydraulic Model. Utilized InfoWater and ArcGIS tools to update the current model based on the GIS data provided by the Region of Peel. Communicated with the Region of Peel regarding acquisition of data required for model update. Coordinated work required to perform model calibration. Completed in 2015.

Region of Peel Modelling Analysis for Block 51-1 and Block 51-2, Peel, Ontario. AECOM Project. Updated existing Region of Peel InfoWater hydraulic model with detailed watermain network in Development Blocks 51-1 and 51-2 based on provided ArcGIS shapefiles. Assigned demand to the new development areas based on expected residential and employment population and land use. Performed hydraulic analysis to determine best servicing strategies for the development in order to meet the Region of Peel Design Criteria for Water Distribution Systems. Completed in 2015.

16th Avenue Watermain Relocation Hydraulic Analysis, City of Markham, Canada. AECOM Project. Conducted hydraulic analysis of a water main relocation under maximum day demand (MDD) and MDD + fire flow scenarios using InfoWater modeling software. Completed in 2014.

City of Markham Hydraulic Model Calibration, Markham, Ontario. Provided technical support in preparing the Flow Balance worksheet. Performed Macro and Micro-level Calibration using InfoWater Software. Reviewed existing City of Markham Hydraulic Model for deficiencies and updated based on GIS data. Prepared a Draft Report with model calibration results for submission to the client. Received Client Satisfaction Score of 9/10 for the project. Completed in 2013.


Lambton Area Water Supply System (LAWSS), 20 Year Growth Plan, Point Edward, Ontario. AECOM Project. Provided technical evaluation of water servicing strategies for LAWSS. Coordinated hydraulic modelling assessment of interim servicing strategies and phasing of the required infrastructure. Developed conceptual cost estimates for the preferred servicing alternatives. Completed in 2020.

City of Toronto, Non-Revenue Water and Leak Reduction Strategy, Toronto, Ontario. AECOM Project. Analyzed Pressure District 2 for potential implementation of District Metered Areas. Used InfoWater hydraulic model for PD 1, 1W, 2 to develop scenarios with potential DMAs. Assessed impact of DMA implementation on the water distribution system and provided recommendations for optimization. Performed project management tasks as required. Completed in 2020.

City of Brampton, Downtown Flood Protection Landform Class EA Study, Brampton, Ontario. AECOM Project. Advised the environmental planning team on the existing water, sanitary and storm sewer infrastructure in the City of Brampton downtown core and impacts of potential Flood Protection Landforms on the existing infrastructure. Completed in 2019.

City of Richmond, Horseshoe Slough Sedimentation Investigation, Richmond. AECOM Project. Responsible for day to day schedule, resource allocation and budget management. Led the investigation to identify sources of sediment within the Horseshoe Slough using field investigation and hydraulic modelling techniques and provide recommendations to reduce the impact of sedimentation on the Slough and downstream drainage pump station. Completed in 2018.

Capital Regional District, Inflow and Infiltration Metrics and Methodologies. AECOM Project. Managed a review of industry standards for Inflow and Infiltration (I&I) management methodologies in Canada, USA, and Europe and developed I&I metrics and methodologies that enable productive I&I management process comparison between Canadian municipalities. Completed in 2018.

National Water and Wastewater Benchmarking Initiative, Various Clients. AECOM Project. Facilitated municipalities in benchmarking their water, wastewater and stormwater utilities. Assisted in data collection in order to improve utility performance measures. Managed the Inflow and Infiltration Task Force. Presented and reviewed the results of the benchmarking initiative with the client. Developed working relationships with clients across Canada. Completed in 2018.

GTAA InfoWater Hydraulic Model Development, Pearson International Airport, Ontario. AECOM Project. Used existing GTAA watermain ArcGIS shapefiles to update the Region of Peel Hydraulic Model and assign local demand for the Greater Toronto Airports Authority based on bulk meter billing records Performed a desktop criticality analysis to identify supply redundancy for major facilities within the GTAA water distribution network. Completed in 2014.

City of Markham District Metered Areas (DMA) Feasibility Study. Markham, Ontario. AECOM Project. Performed hydraulic analysis of the City of Markham water distribution system to provide overview of the system and select zones which could serve as a DMA.Provided preliminary design of the DMAs using the latest InfoWater hydraulic model. Developed a phasing plan for DMAs implementation in the City of Markham. Presented the DMA Preliminary Design to the senior staff at the City of Markham. Completed in 2014.

Speightstown Watershed Water Availability Systems Dynamic Model Development. Barbados. Designed and developed a System Dynamics Model for assessment of water availability in Speightstown catchment, Barbados (approx. 31km2). Completed in 2013.

Don’t Have Time to Review Every Project?

Let’s jump on a quick call to discuss your needs and how HydraLink can help.